Central Health Services Center Project DEIR
Table of ContentsCover Page
Executive Summary
Introduction
Project Description
Environmental Setting, Thresholds of Significance, Environmental Impacts, and Mitigation Measures
- Visual Resources
- Air Quality
- Land Use and Planning
- Cultural Resources
- Earth Resources
- Hazards & Hazardous Materials
- Hydrology, Water Quality, & Shoreline Biological Resources
- Noise
- Employment, Population, & Housing
- Public Services & Utilities
- Transportation
Other CEQA Sections
Alternatives To The Project
Organizations and Persons Consulted
Report Preparation Personnel
References
Appendices
- A - Notice of Preparation
- B - Visual Simulation Methodology
- C - Historic Structures Report
- D - Air Quality Modeling Results
- E - Traffic Noise Modeling Results
- F - Final Traffic Study
- G - Alternatives Considered in Siting the Proposed Central Health Services Center
- Summary of Project Impacts and Mitigation Measures
- Approximate Number of Staff Added by the Proposed Project
- Ambient Air Quality Standards and Designations for Marin County
- Summary of Annual Ambient Air Quality Data (2004-2006)
- Summary of Modeled Maximum Daily Short-Term Construction-Generated Emissions
- Summary Long-Term Regional Emissions
- Chronology of Important Events and Construction at San Quentin State Prison
- Estimated Earthquake Magnitude Parameters for Major Earthquake Sources Near Project Site
- Summary of Hazardous Materials Regulatory Authority
- Vibration Perceptibility of Humans
- Ambient Noise Measurements
- Calculated Existing Roadway Traffic Noise
- Marin County Benchmarks for Allowable Noise Exposure from Stationary Noise Sources
- City of Larkspur Exterior Noise Limits
- Noise Levels Generated by Typical Construction Equipment
- Predicted Traffic Noise Levels
- Geographic Distribution of Current SQSP Employees
- Projected Incremental Water Demands for the Central Health Services Center
- Signalized Intersection Level of Service Definitions
- Unsignalized Intersection Level of Service Definition, Two-Way Stop & All-Way Stop Controlled Intersections
- Traffic Operating Conditions Existing Scenario
- Traffic Operating Conditions Background Scenario
- Project Trip Generation
- Traffic Operating Conditions Project Scenario
- Project Contribution to Existing Intersection Volumes
- Traffic Operating Conditions Weekday A.M. Peak Comparison
- Traffic Operating Conditions Weekday Midday Peak Comparison
- Traffic Operating Conditions Weekday P.M. Peak Comparison
- Traffic Operating Conditions Weekend Midday Peak Comparison
- Existing Parking Supply vs. Parking Demand
- List of Projects in San Quentin State Prison Vicinity
- Geographic Scope of Cumulative Impacts