{"id":3368,"date":"2019-06-13T23:06:51","date_gmt":"2019-06-13T23:06:51","guid":{"rendered":"http:\/\/cdcr-migration.10upmanaged.com\/careers\/?p=3368"},"modified":"2020-04-23T14:06:59","modified_gmt":"2020-04-23T21:06:59","slug":"job-analysis-senior-estimator-of-building-construction","status":"publish","type":"post","link":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/","title":{"rendered":"JOB ANALYSIS: Senior Estimator of Building Construction"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>BACKGROUND INFORMATION<\/strong><\/h2>\n\n\n\n<p><strong>Date of Study: <\/strong>November 28, 2016 \u2013 November 30, 2016<\/p>\n\n\n\n<p><strong>Collective Bargaining\nIdentification: <\/strong>R11<\/p>\n\n\n\n<p><strong>Job Analysis Conducted By:<\/strong>\nLaToya Garland, Office of Workforce Planning,\nDepartment of Corrections and Rehabilitation<\/p>\n\n\n\n<p><strong>Number of Incumbents: <\/strong>There are 5 incumbents in this classification per the\nState Controller\u2019s Office Filled\/Vacant Position Report dated October 12, 2016.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>EDITED TASK LISTING<\/strong><\/h2>\n\n\n\n<p><strong><em>NOTE:\nEach position within this classification may perform some or all of these\ntasks.<\/em><\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><em>Task Statements:<\/em><\/strong><\/h3>\n\n\n\n<p>1.\n&nbsp;Prepare conceptual cost estimates for\nconstruction project proposals to create an initial budget and determine\noverall project feasibility utilizing a conceptual plan, electronic estimating\ntools, and historical data as required. <\/p>\n\n\n\n<p>2.\n&nbsp;Prepare preliminary cost estimates for\napproved construction projects to refine the scope of the project by revising\nor updating the conceptual budget to include detailed labor and material costs\nutilizing electronic estimating tools, preliminary plans, and specifications as\nrequired.<\/p>\n\n\n\n<p>&nbsp;3. &nbsp;Prepare\nfinal costs estimates for approved construction projects to begin development\nof contract bid documents by revising or updating the preliminary budget with finalized\nscope and design changes, labor, and materials utilizing electronic estimating\ntools, final approved plans and specifications as required.<\/p>\n\n\n\n<p>&nbsp;4. &nbsp;Complete\nquantity surveys of materials and labor required for construction projects to\ncreate accurate cost estimates utilizing plans and specifications during the\ndifferent phases of projects (e.g. conceptual, preliminary, and final) as\nrequired. <\/p>\n\n\n\n<p>5.\n&nbsp;Direct construction projects via site\nvisits to validate scope, schedule, and budget and determine the quality of\nwork performed is in accordance with project and departmental requirements as\nrequired.<\/p>\n\n\n\n<p>&nbsp;6. &nbsp;Assist\nwith the supervision, evaluation, and coordination of other estimators\u2019\nprojects by reviewing project scope to ensure project budget and timelines are\nbeing met, as directed. <\/p>\n\n\n\n<p>7.\n&nbsp;Assist with the training of estimators\non various methods of developing cost estimates for construction projects\nutilizing established policies, procedures and historical data as required. <\/p>\n\n\n\n<p>8.\n&nbsp;Estimate material and labor costs of\nconstruction projects to create cost estimates during the different phases of\nprojects (e.g. conceptual, preliminary, and final) utilizing plans and\nspecifications, electronic estimating tools, and contractor pricing, etc., as\nrequired.<\/p>\n\n\n\n<p>&nbsp;9. &nbsp;Develop\nthe total cost of construction projects by combining hard cost estimates with\nsoft cost estimates (i.e. permits, fees, and taxes) to finalize project budget\nand contract bid documents utilizing input from one or more entities (e.g.,\ndesigners, stakeholders, contractors, etc.) as required. <\/p>\n\n\n\n<p>10.\n&nbsp;Prepare unit and total costs of\ncompleted jobs to capture historical data for future use and reference of new\nprojects utilizing established database as required. <\/p>\n\n\n\n<p>11.\n&nbsp;Review and negotiate cost of proposed\nproject and scope change orders submitted by contractors to ensure department\nis receiving fair market value utilizing cost estimating tools and contract\npricing as required. <\/p>\n\n\n\n<p>12.\n&nbsp;Prepare preliminary cost estimate for\nstakeholders from small scale sketches for the development of a project budget\nutilizing cost estimating tools and contract pricing as required. <\/p>\n\n\n\n<p>13.\n&nbsp;Assist with the writing of short\nspecifications (i.e., Design and Construction Guidelines) for requisition and\ninstallation of materials in accordance with project and departmental\nrequirements as required. <\/p>\n\n\n\n<p>14.\n&nbsp;Prepare labor and material lists for\nconstruction projects to determine if all required materials are included in\nthe bid utilizing electronic estimating tools and contract pricing as required.\n<\/p>\n\n\n\n<p>15.\n&nbsp;Prepare requisition documents for labor\nand materials required for project completion utilizing established procurement\nprocedures and contract pricing as required. <\/p>\n\n\n\n<p>16.\n&nbsp;Make valuation appraisals of existing\ninfrastructure to determine feasibility of proposed project scope utilizing\nconstruction plans, specifications, and as-built drawings as required. <\/p>\n\n\n\n<p>17.\n&nbsp;Prepare written correspondence to\nprovide or request project information from designers, contractors,\nstakeholders, etc. utilizing electronic communication (e.g. email, SharePoint,\nand Request For Information, etc.) as required. <\/p>\n\n\n\n<p>18.\n&nbsp;<strong>Document\nand track completed cost estimates associated with detailed costs for labor and\nmaterials utilizing computer based programs (i.e. excel) to ensure all expenditures\nare within approved budget as required. <\/strong><\/p>\n\n\n\n<p>19.\n&nbsp;<strong>Reconcile\nproject purchase orders to ensure project remains within approved budget and\nprovide detailed funding information to the project team and stakeholders\nutilizing computer based programs (i.e. email and excel) as required. <\/strong><\/p>\n\n\n\n<p>20.\n&nbsp;<strong>Review\nplans and specifications for construction projects to identify errors,\ndiscrepancies, or omissions in accordance with project and departmental\nrequirements utilizing a computer based project tracking program as required.<\/strong><\/p>\n\n\n\n<p>&nbsp;21. &nbsp;<strong>Act as lead estimator for construction\nprojects to ensure projects are operating within scope, schedule, and budget\nutilizing effective communication and leadership skills throughout the life of\nthe project as required.<\/strong> <\/p>\n\n\n\n<p>22.<strong> &nbsp;Conduct\nproject site visits to review existing physical conditions to ensure a thorough\nunderstanding of project construction plans utilizing visual inspections,\ntaking worksite photographic images, and general location awareness throughout\nthe life of the project as required. <\/strong><\/p>\n\n\n\n<p>23.<strong> &nbsp;Perform\nvalue engineering of plans and specifications for construction projects to\ndetermine areas of potential cost savings and ensure final cost estimates are\nwithin budget utilizing electronic estimating tools, historical data, and\ncontractor pricing as required.<\/strong> <\/p>\n\n\n\n<p>24.\n&nbsp;<strong>Review\nofficial bid award documents to determine if the bids are within project scope\nand departmental requirements utilizing final cost estimates, plans and\nspecifications as required.<\/strong> <\/p>\n\n\n\n<p>25.\n&nbsp;<strong>Interview\nthe low bidder when a large discrepancy exists between their bid and the\nproject estimate to identify reasons for the discrepancy utilizing documented\ncommunication (i.e. written correspondence) as required. <\/strong><\/p>\n\n\n\n<p>26.\n&nbsp;<strong>Communicate\neffectively with the project team and stakeholders utilizing meetings, emails,\nconference calls, etc., to ensure all project requirements are met for scope,\nschedule, and budget throughout the life of the project as required.<\/strong> <\/p>\n\n\n\n<p>27.\n&nbsp;<strong>Maintain\na database and\/or files that contain completed construction project\ndocumentation (e.g., as-built drawings, photographs, test results, etc.) to\nretain historical project data utilizing electronic and hard copy file storage\nas required.<\/strong> <\/p>\n\n\n\n<p>28.\n&nbsp;<strong>Conduct\na project close out inspection with the project team, contractors, and\nstakeholders to identify and document punch list items for corrective action\nutilizing plans, cost estimates, and change orders as required.<\/strong> <\/p>\n\n\n\n<p>29. \u00a0<strong>Attend meetings with the project team and stakeholders to receive and communicate updated information related to project scope, schedule, and budget throughout the life of the project utilizing conference calls or site visits as required.<\/strong> <\/p>\n\n\n\n<p>30.\n&nbsp;<strong>Analyze\ncompleted projects with the project team and stakeholders to identify and\ndiscuss successes, failures, lessons learned, and project outcomes that may be\nused for future construction projects and historical data by conducting project\nclose out meetings as required.<\/strong> <\/p>\n\n\n\n<p>31.\n&nbsp;<strong>Analyze\nplans and specifications to ensure consistency with project and departmental requirements,\nutilizing project team and stakeholder reviews, project scope, construction\nschedules, etc., throughout the life of the project as required.<\/strong><\/p>\n\n\n\n<p><em>Tasks\nhighlighted in bold text are not currently on the SPB classification\nspecification<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>EDITED KSAPC LISTING<\/strong><\/h2>\n\n\n\n<p><strong><em>NOTE: Each position within this classification may perform\nsome or all of these KSAPCs.<\/em><\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><em>Knowledge of:<\/em><\/strong><\/h3>\n\n\n\n<p>K1.\n&nbsp;<strong>Comprehensive\nknowledge<\/strong> of labor costs to determine accuracy and completeness of cost\nestimates from contractors. <\/p>\n\n\n\n<p>K2.\n&nbsp;<strong>Comprehensive\nknowledge<\/strong> of various building materials and their units of measure used in\nbuilding construction to ensure the type and quantity of materials will meet\nproject specification requirements, building codes, accepted industry\nstandards, construction guidelines and project requirements. <\/p>\n\n\n\n<p>K3.\n&nbsp;<strong>Comprehensive\nknowledge<\/strong> of current prices for building materials to determine the\naccuracy and completeness of cost estimates from contractors. <\/p>\n\n\n\n<p>K4.\n&nbsp;<strong>Comprehensive\nknowledge<\/strong> of current wage scale for various building and construction\ntrades to identify specific types of contractors required for project and to\ndetermine costs for prevailing wage and per diem that will impact the project\nbudget. <\/p>\n\n\n\n<p>K5.\n&nbsp;<strong>Comprehensive\nknowledge<\/strong> of principles and techniques of effective supervision to provide\nproject management oversight of construction crew and ensure project scope and\ntimelines are met.<\/p>\n\n\n\n<p><em>KSAPCs\nhighlighted in bold text are not currently on the SPB classification\nspecification<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><em>Ability to:<\/em><\/strong><\/h3>\n\n\n\n<p>A1. &nbsp;Read and\ninterpret plans and specifications, and make complete and accurate estimates of\nthe material and labor costs and various other items entering into the cost of\nbuilding construction. <\/p>\n\n\n\n<p>A2. &nbsp;Detect\nerrors and discrepancies in plans and specifications to determine impact to\nproject scope, schedule, and budget.<\/p>\n\n\n\n<p>&nbsp;A3. &nbsp;Make valuation appraisals of existing\nbuildings when estimating project scope to determine if a project is feasible\nor cost prohibited. <\/p>\n\n\n\n<p>A4. &nbsp;Write\nclear and comprehensive reports and correspondence to document project\nrequirements, cost estimates, issues, and budget tracking, etc.<\/p>\n\n\n\n<p>&nbsp;A5. &nbsp;Train, supervise, and direct the work of\ncontractors in accordance with project and departmental requirements.<\/p>\n\n\n\n<p>&nbsp;A6. &nbsp;Analyze project issues by accurately assessing\nthe situation and information to determine the best course of action for a\nreasonable and acceptable resolution. <\/p>\n\n\n\n<p>A7. &nbsp;<strong>Prepare emails and communicate project\nrelated items to individuals (e.g., project team, stakeholders, contractors,\nco-workers, supervisors, etc.)<\/strong> <\/p>\n\n\n\n<p>A8<strong>. &nbsp;Provide project management oversight of<\/strong> <strong>contractors to identify and validate scope\nof work during the design, engineering and construction phases of projects<\/strong>.\n<\/p>\n\n\n\n<p>A9. &nbsp;<strong>Demonstrate effective oral and written\ncommunication skills, at a level required for successful job performance, when\ninteracting with a project team, stakeholders, contractors, etc.<\/strong><\/p>\n\n\n\n<p><em>KSAPCs\nhighlighted in bold text are not currently on the SPB classification\nspecification<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BACKGROUND INFORMATION Date of Study: November 28, 2016 \u2013 November 30, 2016 Collective Bargaining Identification: R11 Job Analysis Conducted By: [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"hide_featured_image_on_mobile":false,"hide_featured_image_on_post_details":false,"footnotes":""},"categories":[2],"class_list":["post-3368","post","type-post","status-publish","format-standard","hentry","category-job-analysis"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>JOB ANALYSIS: Senior Estimator of Building Construction - CDCR Careers<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"JOB ANALYSIS: Senior Estimator of Building Construction - CDCR Careers\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"CDCR Careers\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-13T23:06:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-04-23T21:06:59+00:00\" \/>\n<meta name=\"author\" content=\"Brent\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brent\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/\"},\"author\":{\"name\":\"Brent\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/#\\\/schema\\\/person\\\/5a2cb7d071522ab449e49cf76c38377e\"},\"headline\":\"JOB ANALYSIS: Senior Estimator of Building Construction\",\"datePublished\":\"2019-06-13T23:06:51+00:00\",\"dateModified\":\"2020-04-23T21:06:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/\"},\"wordCount\":1493,\"articleSection\":[\"Job Analysis\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/\",\"name\":\"JOB ANALYSIS: Senior Estimator of Building Construction - CDCR Careers\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/#website\"},\"datePublished\":\"2019-06-13T23:06:51+00:00\",\"dateModified\":\"2020-04-23T21:06:59+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/#\\\/schema\\\/person\\\/5a2cb7d071522ab449e49cf76c38377e\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/2019\\\/06\\\/13\\\/job-analysis-senior-estimator-of-building-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"JOB ANALYSIS: Senior Estimator of Building Construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/#website\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/\",\"name\":\"CDCR Careers\",\"description\":\"CDCR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/#\\\/schema\\\/person\\\/5a2cb7d071522ab449e49cf76c38377e\",\"name\":\"Brent\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33a0662393b36ceb81e3d636b3d915bcc3569e6d4b161b427e03de378391b336?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33a0662393b36ceb81e3d636b3d915bcc3569e6d4b161b427e03de378391b336?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33a0662393b36ceb81e3d636b3d915bcc3569e6d4b161b427e03de378391b336?s=96&d=mm&r=g\",\"caption\":\"Brent\"},\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/careers\\\/author\\\/brentkurosawa\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"JOB ANALYSIS: Senior Estimator of Building Construction - CDCR Careers","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/","og_locale":"en_US","og_type":"article","og_title":"JOB ANALYSIS: Senior Estimator of Building Construction - CDCR Careers","og_url":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/","og_site_name":"CDCR Careers","article_published_time":"2019-06-13T23:06:51+00:00","article_modified_time":"2020-04-23T21:06:59+00:00","author":"Brent","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Brent","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/#article","isPartOf":{"@id":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/"},"author":{"name":"Brent","@id":"https:\/\/www.cdcr.ca.gov\/careers\/#\/schema\/person\/5a2cb7d071522ab449e49cf76c38377e"},"headline":"JOB ANALYSIS: Senior Estimator of Building Construction","datePublished":"2019-06-13T23:06:51+00:00","dateModified":"2020-04-23T21:06:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/"},"wordCount":1493,"articleSection":["Job Analysis"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/","url":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/","name":"JOB ANALYSIS: Senior Estimator of Building Construction - CDCR Careers","isPartOf":{"@id":"https:\/\/www.cdcr.ca.gov\/careers\/#website"},"datePublished":"2019-06-13T23:06:51+00:00","dateModified":"2020-04-23T21:06:59+00:00","author":{"@id":"https:\/\/www.cdcr.ca.gov\/careers\/#\/schema\/person\/5a2cb7d071522ab449e49cf76c38377e"},"breadcrumb":{"@id":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.cdcr.ca.gov\/careers\/2019\/06\/13\/job-analysis-senior-estimator-of-building-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cdcr.ca.gov\/careers\/"},{"@type":"ListItem","position":2,"name":"JOB ANALYSIS: Senior Estimator of Building Construction"}]},{"@type":"WebSite","@id":"https:\/\/www.cdcr.ca.gov\/careers\/#website","url":"https:\/\/www.cdcr.ca.gov\/careers\/","name":"CDCR Careers","description":"CDCR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cdcr.ca.gov\/careers\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.cdcr.ca.gov\/careers\/#\/schema\/person\/5a2cb7d071522ab449e49cf76c38377e","name":"Brent","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/33a0662393b36ceb81e3d636b3d915bcc3569e6d4b161b427e03de378391b336?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/33a0662393b36ceb81e3d636b3d915bcc3569e6d4b161b427e03de378391b336?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/33a0662393b36ceb81e3d636b3d915bcc3569e6d4b161b427e03de378391b336?s=96&d=mm&r=g","caption":"Brent"},"url":"https:\/\/www.cdcr.ca.gov\/careers\/author\/brentkurosawa\/"}]}},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"CDCR Careers","distributor_original_site_url":"https:\/\/www.cdcr.ca.gov\/careers","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/posts\/3368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/comments?post=3368"}],"version-history":[{"count":2,"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/posts\/3368\/revisions"}],"predecessor-version":[{"id":4779,"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/posts\/3368\/revisions\/4779"}],"wp:attachment":[{"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/media?parent=3368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cdcr.ca.gov\/careers\/wp-json\/wp\/v2\/categories?post=3368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}