{"id":1586,"date":"2026-05-13T13:46:03","date_gmt":"2026-05-13T20:46:03","guid":{"rendered":"https:\/\/www.cdcr.ca.gov\/fpcm\/?page_id=1586"},"modified":"2026-05-26T15:19:27","modified_gmt":"2026-05-26T22:19:27","slug":"cdcr-infrastructure-master-plan","status":"publish","type":"page","link":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/","title":{"rendered":"CDCR Infrastructure Master Plan"},"content":{"rendered":"\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group has-green-200-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading has-text-align-center\"><strong>A 20-year roadmap to address aging infrastructure and support safer, more modern correctional environments across California.<\/strong><\/h2>\n\n\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-fe48e5de wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Infrastructure-Master-Plan-Final-ADA.pdf\">Read the Report<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-btn-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/vimeo.com\/1191566691\/14f557fb80?share=copy&fl=sv&fe=ci\">Watch the Video<\/a><\/div>\n\n\n\n<div class=\"wp-block-button is-style-btn-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-20-year-Plan-Brochure-FINAL.pdf\">View the Brochure<\/a><\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<h3 class=\"wp-block-heading\"><strong>Overview<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">CDCR\u2019s institutions include housing units, health care space, kitchens, classrooms, utilities, fire and life safety systems, visiting areas, and other infrastructure needed to operate secure facilities 24 hours a day. Many of these facilities are more than 50 years old.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Many facilities were built decades ago and have not received the sustained investment needed to meet today\u2019s correctional needs, including rehabilitation, health care, accessibility, cooling, family connection, staff wellness, or reentry preparation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Infrastructure Master Plan provides a long-term framework to assess facility conditions, prioritize investments, and guide modernization efforts over the next 20 years.<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_20260514-FINAL.pdf\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"663\" src=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-1024x663.jpg\" alt=\"Timeline titled &quot;A Shift in Purpose: Historical Timeline of California State Prison Openings and Major Changes in Approach to Rehabilitation&quot;\" class=\"wp-image-1636 size-full\" srcset=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-1024x663.jpg 1024w, https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-300x194.jpg 300w, https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-768x497.jpg 768w, https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-1536x994.jpg 1536w, https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-2048x1325.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\"><strong>Why the Plan Is Needed<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Aging infrastructure and decades of deferred investments affects daily operations across the system, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Safety and security<\/li>\n\n\n\n<li>Health care delivery<\/li>\n\n\n\n<li>Rehabilitation programming<\/li>\n\n\n\n<li>Accessibility<\/li>\n\n\n\n<li>Heating and cooling<\/li>\n\n\n\n<li>Staff work environments<\/li>\n\n\n\n<li>Utility reliability<\/li>\n\n\n\n<li>Long-term maintenance costs<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\"><strong>Five-Year Planning Focus<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The first phase of planning focuses on significant infrastructure assessment and modernization efforts at:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>California Medical Facility<\/li>\n\n\n\n<li>Central California Women\u2019s Facility<\/li>\n\n\n\n<li>Sierra Conservation Center<\/li>\n\n\n\n<li>California State Prison, Corcoran<\/li>\n\n\n\n<li>California Institution for Men<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These institutions were identified based on infrastructure conditions, operational needs, and long-term planning priorities. CDCR will continue to assess other institutions and statewide infrastructure needs as part of future planning cycles.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-vimeo wp-block-embed-vimeo wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Embedded Content from Vimeo\" src=\"https:\/\/player.vimeo.com\/video\/1191566691?h=14f557fb80&dnt=1&app_id=122963\" width=\"500\" height=\"281\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Documents<\/strong><\/h3>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Infrastructure Master Plan Report<br><\/strong>Full report outlining the Department\u2019s infrastructure assessment, long-term strategy, and five-year planning focus.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Infrastructure-Master-Plan-Final-ADA.pdf\">Download PDF<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Infrastructure Master Plan Brochure<\/strong><br>Public overview of CDCR\u2019s infrastructure needs and modernization strategy.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-20-year-Plan-Brochure-FINAL.pdf\">Download PDF<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CDCR Timeline<br><\/strong>Detailed timeline noting the year each CDCR institution was opened and when major shifts in approach to rehabilitation occurred.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_20260514-FINAL.pdf\">Download PDF<\/a><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Appendix 1: Institution Profiles<\/strong><br>Facility information and institution-level summaries.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/Appendix-1-CDCR-Adult-Institutions-ADA.pdf\">Download PDF<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Appendix 2: Condition Assessments<\/strong><br>Infrastructure condition ratings and system analysis.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/Appendix-2-Condition-Assessment-ADA.pdf\">Download PDF<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Appendix 3: 20 Year Infrastructure Needs<\/strong><br>Current infrastructure replacement estimates.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/Appendix-3-20-Year-Infrastructure-Needs-ADA.pdf\">Download PDF<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Appendix 4: Construction Schedules<\/strong><br>Planning timelines and proposed construction phasing.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-btn-light-green\"><a class=\"wp-block-button__link has-small-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/Appendix-4-Infrastructure-Master-Plan-Schedule-ADA.pdf\">Download PDF<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Important Note<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Projects identified in the Infrastructure Master Plan are subject to the standard budget review and approval process, including review and consideration by the Department of Finance and the Legislature. Inclusion in the Plan does not constitute project approval or funding authorization.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group has-green-200-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading has-green-600-color has-text-color has-link-color wp-elements-c47461432944280301a78a1c70c54aa8\" style=\"font-size:25px\"><strong>Frequently Asked Questions:<\/strong><\/h3>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-1&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading has-medium-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-1-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-1\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>Why does CDCR need an Infrastructure Master Plan?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-1\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-1-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">CDCR operates 31 institutions across the state, many of which are more than 50 years old. These facilities were not originally designed for today\u2019s correctional needs, including rehabilitation, health care, accessibility, and staff wellness. Decades of deferred investment have resulted in aging infrastructure that can affect safety, operations, and the Department\u2019s ability to carry out its modern mission. The Infrastructure Master Plan provides a long-term framework to assess conditions, prioritize investments, and guide modernization over the next 20 years.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-2&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading has-medium-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-2-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-2\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>How were the five institutions in the Five-Year Planning Focus selected?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-2\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-2-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">CDCR conducted a condition assessment of all 31 institutions, evaluating building systems, utilities, and infrastructure. The five institutions identified for the initial five-year focus were selected based on infrastructure condition, operational needs, geographic location, mission, custody level, and long-term planning priorities. The Plan is designed to be revisited approximately every five years to reassess system-wide needs and determine the next phase of investment.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-3&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading has-medium-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-3-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-3\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>Does this Plan mean these projects are approved and funded?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-3\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-3-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">No. Projects identified in the Infrastructure Master Plan are subject to the standard budget review and approval process, including review and consideration by the Department of Finance and the Legislature. Inclusion in the Plan does not constitute project approval or funding authorization. All proposals will be submitted as part of future budget processes for consideration and will only proceed upon approval.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-4&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading has-medium-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-4-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-4\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>What happens to institutions not included in the first five-year phase?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-4\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-4-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">The Infrastructure Master Plan covers all 31 institutions. While the initial five-year focus concentrates on five institutions with the most critical needs, CDCR will continue to assess and address infrastructure needs at all other institutions. The Plan is meant to be a dynamic guide, revisited approximately every five years to assess progress and realign efforts as the Department evolves.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-5&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading has-medium-font-size\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-5-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-5\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>How does infrastructure investment support rehabilitation and safety?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-5\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-5-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Modern infrastructure is essential to the Department\u2019s mission of rehabilitation, safety, and successful reentry. Aging and outdated facilities limit CDCR\u2019s ability to deliver health care, provide rehabilitative programming, ensure accessibility, and maintain safe environments for both incarcerated individuals and staff. Investing in infrastructure supports the Department\u2019s ongoing transformation toward a correctional environment that fosters rehabilitation, improves safety, and focuses on the well-being of everyone who lives and works in these institutions.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>A 20-year roadmap to address aging infrastructure and support safer, more modern correctional environments across California. Overview CDCR\u2019s institutions include [&hellip;]<\/p>\n","protected":false},"author":952,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"hide_featured_image_on_mobile":false,"hide_featured_image_on_post_details":false,"footnotes":""},"class_list":["post-1586","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CDCR Infrastructure Master Plan - Facility Planning, Construction and Management (FPCM)<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CDCR Infrastructure Master Plan - Facility Planning, Construction and Management (FPCM)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"Facility Planning, Construction and Management (FPCM)\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T22:19:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1656\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/\",\"name\":\"CDCR Infrastructure Master Plan - Facility Planning, Construction and Management (FPCM)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/wp-content\\\/uploads\\\/sites\\\/184\\\/2026\\\/05\\\/CDCR-Timeline_v2-1024x663.jpg\",\"datePublished\":\"2026-05-13T20:46:03+00:00\",\"dateModified\":\"2026-05-26T22:19:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/wp-content\\\/uploads\\\/sites\\\/184\\\/2026\\\/05\\\/CDCR-Timeline_v2-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/wp-content\\\/uploads\\\/sites\\\/184\\\/2026\\\/05\\\/CDCR-Timeline_v2-scaled.jpg\",\"width\":2560,\"height\":1656,\"caption\":\"Timeline titled \\\"A Shift in Purpose: Historical Timeline of California State Prison Openings and Major Changes in Approach to Rehabilitation\\\"\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/cdcr-infrastructure-master-plan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CDCR Infrastructure Master Plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/#website\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/\",\"name\":\"Facility Planning, Construction and Management (FPCM)\",\"description\":\"CDCR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/fpcm\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CDCR Infrastructure Master Plan - Facility Planning, Construction and Management (FPCM)","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/","og_locale":"en_US","og_type":"article","og_title":"CDCR Infrastructure Master Plan - Facility Planning, Construction and Management (FPCM)","og_url":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/","og_site_name":"Facility Planning, Construction and Management (FPCM)","article_modified_time":"2026-05-26T22:19:27+00:00","og_image":[{"width":2560,"height":1656,"url":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/","url":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/","name":"CDCR Infrastructure Master Plan - Facility Planning, Construction and Management (FPCM)","isPartOf":{"@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/#primaryimage"},"image":{"@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-1024x663.jpg","datePublished":"2026-05-13T20:46:03+00:00","dateModified":"2026-05-26T22:19:27+00:00","breadcrumb":{"@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/#primaryimage","url":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-scaled.jpg","contentUrl":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-content\/uploads\/sites\/184\/2026\/05\/CDCR-Timeline_v2-scaled.jpg","width":2560,"height":1656,"caption":"Timeline titled \"A Shift in Purpose: Historical Timeline of California State Prison Openings and Major Changes in Approach to Rehabilitation\""},{"@type":"BreadcrumbList","@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/cdcr-infrastructure-master-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cdcr.ca.gov\/fpcm\/"},{"@type":"ListItem","position":2,"name":"CDCR Infrastructure Master Plan"}]},{"@type":"WebSite","@id":"https:\/\/www.cdcr.ca.gov\/fpcm\/#website","url":"https:\/\/www.cdcr.ca.gov\/fpcm\/","name":"Facility Planning, Construction and Management (FPCM)","description":"CDCR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cdcr.ca.gov\/fpcm\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Facility Planning, Construction and Management (FPCM)","distributor_original_site_url":"https:\/\/www.cdcr.ca.gov\/fpcm","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/pages\/1586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/users\/952"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/comments?post=1586"}],"version-history":[{"count":19,"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/pages\/1586\/revisions"}],"predecessor-version":[{"id":1648,"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/pages\/1586\/revisions\/1648"}],"wp:attachment":[{"href":"https:\/\/www.cdcr.ca.gov\/fpcm\/wp-json\/wp\/v2\/media?parent=1586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}