{"id":7689,"date":"2020-03-31T09:23:53","date_gmt":"2020-03-31T16:23:53","guid":{"rendered":"http:\/\/cdcr.test\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/"},"modified":"2020-03-31T09:23:53","modified_gmt":"2020-03-31T16:23:53","slug":"21040-9-capital-outlay-timetable","status":"publish","type":"dom","link":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/","title":{"rendered":"21040.9 Capital Outlay Timetable"},"content":{"rendered":"\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>The following schedule has been established to meet the CDCR and DOF time frames. A detailed timetable for the current budget cycle shall be developed annually and provided to the facilities. Facilities shall adhere to this annual timetable so that analysis and processing may occur in an orderly and effective manner within statewide deadlines. Dates on which facilities are required to submit items are the dates for OFM action in order to forward the items to the Secretary, CDCR, and DOF within the statewide deadlines:<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Year One:<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>March <\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>The OFM shall issue a &#8220;Budget Call Letter&#8221; to all facilities requesting the development of budget concept papers for the major and minor capital outlay program and identifying the time frames for the upcoming budget cycle.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>April<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Deadline for the receipt of concept papers for all major and minor capital outlay projects.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>May<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Capital outlay analysts may conduct on-site reviews of all proposed projects in preparation for project priority setting.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>A committee that includes representatives of the Division of Adult Institutions, Division of Correctional Health Care Services, Office of Substance Abuse, Joint Venture Program, and OFM makes project priority recommendations. These recommendations are the basis for determining which projects should be fully developed into COBCP&#8217;s.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Based on the approved priorities and subject to the availability of funding, facilities are given approval to develop COBCP&#8217;s.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>July<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Deadline for submission of COBCP&#8217;s to OFM.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>September<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Review and discussion of project analysis, recommendations and COBCP&#8217;s deficiencies are conducted with facility staff.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>October<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>All final COBCP&#8217;s are due to OFM.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>November<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>The OFM recommendations and analysis are submitted to the Office of the Secretary to establish the final priority list for the CDCR&#8217;s capital outlay program.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>January \u2013 February 1 The existing facilities five-year capital outlay plan is submitted to the CDCR for approval and then to DOF.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Year Two:<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>July \u2013 August <\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Final approved list of projects submitted to DOF.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>September \u2013 December<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>State Capital Outlay Program Evaluation meetings and review are conducted with DOF. Capital outlay budget hearings are held with the DOF and the CDCR to determine which projects will be included in the Governor&#8217;s budget for the upcoming fiscal year.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>January<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>The Governor&#8217;s Budget and Budget Bill are submitted to the Legislature.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>February<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>The CDCR identifies capital outlay projects that were not included in the Governor&#8217;s Budget, but have become critical. Justification identifying why the projects are now critical must be included in a Finance Letter submission.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>March<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>The CDCR receives the Legislative Analyst&#8217;s Office recommendations of the Governor&#8217;s Budget.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>April \u2013 June<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>Legislative hearings on the Budget Bill are held. During this time, the OFM continues to work with DOF and the Legislative Analyst&#8217;s Office to resolve outstanding issues.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>July<\/p>\n\t\t\t\t\n\t<ul class=\"cdcr-dom-group-block\">\n\t\t\n\t<li class=\"cdcr-dom-item-block\">\n\t\t\t\t\t<p>This is the earliest effective date of the Budget Act. Notification of all major and minor capital outlay projects approved in this process is prepared for transmittal to the institutions and other interested programs.<\/p>\n\t\t\t\t\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\t<\/ul>\n\t\n\t<\/li>\n\t\n\t<\/ul>\n\t","protected":false},"parent":7679,"template":"","class_list":["post-7689","dom","type-dom","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>21040.9 Capital Outlay Timetable - Department Operations Manual (DOM)<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"21040.9 Capital Outlay Timetable - Department Operations Manual (DOM)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/\" \/>\n<meta property=\"og:site_name\" content=\"Department Operations Manual (DOM)\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/article-4-capitol-outlay\\\/21040-9-capital-outlay-timetable\\\/\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/article-4-capitol-outlay\\\/21040-9-capital-outlay-timetable\\\/\",\"name\":\"21040.9 Capital Outlay Timetable - Department Operations Manual (DOM)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/#website\"},\"datePublished\":\"2020-03-31T16:23:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/article-4-capitol-outlay\\\/21040-9-capital-outlay-timetable\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/article-4-capitol-outlay\\\/21040-9-capital-outlay-timetable\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/article-4-capitol-outlay\\\/21040-9-capital-outlay-timetable\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DOM\",\"item\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Chapter 2 &#8211; Fiscal Management\",\"item\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Article 4 &#8211; Capitol Outlay\",\"item\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/dom\\\/chapter-2-fiscal-management\\\/article-4-capitol-outlay\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"21040.9 Capital Outlay Timetable\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/#website\",\"url\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/\",\"name\":\"Operations Manual\",\"description\":\"CDCR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cdcr.ca.gov\\\/operations-manual\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"21040.9 Capital Outlay Timetable - Department Operations Manual (DOM)","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"21040.9 Capital Outlay Timetable - Department Operations Manual (DOM)","og_url":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/","og_site_name":"Department Operations Manual (DOM)","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/","url":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/","name":"21040.9 Capital Outlay Timetable - Department Operations Manual (DOM)","isPartOf":{"@id":"https:\/\/www.cdcr.ca.gov\/operations-manual\/#website"},"datePublished":"2020-03-31T16:23:53+00:00","breadcrumb":{"@id":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/21040-9-capital-outlay-timetable\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cdcr.ca.gov\/operations-manual\/"},{"@type":"ListItem","position":2,"name":"DOM","item":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/"},{"@type":"ListItem","position":3,"name":"Chapter 2 &#8211; Fiscal Management","item":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/"},{"@type":"ListItem","position":4,"name":"Article 4 &#8211; Capitol Outlay","item":"https:\/\/www.cdcr.ca.gov\/operations-manual\/dom\/chapter-2-fiscal-management\/article-4-capitol-outlay\/"},{"@type":"ListItem","position":5,"name":"21040.9 Capital Outlay Timetable"}]},{"@type":"WebSite","@id":"https:\/\/www.cdcr.ca.gov\/operations-manual\/#website","url":"https:\/\/www.cdcr.ca.gov\/operations-manual\/","name":"Operations Manual","description":"CDCR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cdcr.ca.gov\/operations-manual\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Department Operations Manual (DOM)","distributor_original_site_url":"https:\/\/www.cdcr.ca.gov\/operations-manual","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.cdcr.ca.gov\/operations-manual\/wp-json\/wp\/v2\/dom\/7689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cdcr.ca.gov\/operations-manual\/wp-json\/wp\/v2\/dom"}],"about":[{"href":"https:\/\/www.cdcr.ca.gov\/operations-manual\/wp-json\/wp\/v2\/types\/dom"}],"version-history":[{"count":0,"href":"https:\/\/www.cdcr.ca.gov\/operations-manual\/wp-json\/wp\/v2\/dom\/7689\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.cdcr.ca.gov\/operations-manual\/wp-json\/wp\/v2\/dom\/7679"}],"wp:attachment":[{"href":"https:\/\/www.cdcr.ca.gov\/operations-manual\/wp-json\/wp\/v2\/media?parent=7689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}