Article 47 – Disaster Recovery Planning
49040.6 Disaster Recovery Planning – Critical Systems
Revised April 16, 1993-
Department Operational Recovery Plan
-
The Department operational recovery plan shall cover a minimum of four topic areas:
-
Summary of the strategy for managing disaster situations.
-
Distinct management and staff assignment of responsibilities immediately following a disaster and continuing through the period of normal operations re-establishment.
-
Priorities for the recovery of critical applications.
-
Operational procedures documented in systematic fashion that shall allow recovery to be achieved in a timely and orderly way.
-
-
-
Type 1 and Type 2 Operational Recovery Plans
-
All Type 1 and Type 2 systems shall require an operational recovery plan that answers the following questions:
-
Identification and evaluation of alternative recovery strategies.
-
Selection of the alternative that best responds to the organization’s requirements for disaster recovery.
-
Assessment of the resource requirements (space, equipment, communications, data, software, personnel, and time) required for operational recovery of the critical application.
-
-