Department of Corrections and Rehabilitation - Operations Manual

Chapter 4 – Information Technology

Article 47 – Disaster Recovery Planning

View All Sections >

49040.6 Disaster Recovery Planning – Critical Systems

Revised April 16, 1993
  • Department Operational Recovery Plan

    • The Department operational recovery plan shall cover a minimum of four topic areas:

      • Summary of the strategy for managing disaster situations.

      • Distinct management and staff assignment of responsibilities immediately following a disaster and continuing through the period of normal operations re-establishment.

      • Priorities for the recovery of critical applications.

      • Operational procedures documented in systematic fashion that shall allow recovery to be achieved in a timely and orderly way.

  • Type 1 and Type 2 Operational Recovery Plans

    • All Type 1 and Type 2 systems shall require an operational recovery plan that answers the following questions:

      • Identification and evaluation of alternative recovery strategies.

      • Selection of the alternative that best responds to the organization’s requirements for disaster recovery.

      • Assessment of the resource requirements (space, equipment, communications, data, software, personnel, and time) required for operational recovery of the critical application.