Article 4 – California Prison Industry Authority
11040.18 Land Acquisition, Construction, Maintenance, Repairs, and Replacements
-
Distribution of costs for buildings, grounds and roads, equipment and machinery, irrigation and water control, utilities, and land acquisition and construction/alterations is shown in.